Projects Portfolio
-
Successfully conducted commissioning of hundreds of rotating and static equipment to include centrifugal and PD pumps, gearboxes, agitator drives, storage tanks and pressure vessels.
-
Conducted root cause failure investigations on major rotating equipment failures and presented technical reports with recommendations for repair. Visited repair shops to supervise repairs.
-
Performed asset criticality analysis as the Lead Engineer for the review and optimization of the area asset equipment maintenance strategies.
-
Written numerous engineering work scopes, MOC’s and standard work instruction (SWI) for area equipment.
-
Developed work scope and technical specification for replacement of the 36” diameter Transfer line in the Gas Reform area of plant. This $3Million project was successfully completed on schedule, within budget and without injury.
-
Developed work scope and technical specification for overhaul of Turbine compressor. Researched performance history and determined technical basis for pursuing overhaul as opposed to replacement of the 62-year-old Steam Turbine.
-
Wrote technical specifications to fabricate and purchase major equipment to include: Turbo Compressor Oil Cooler and After-cooler, 12500SCFM air compressor and replacement of various process piping throughout the plant.
-
Conducted successful Lurgi and rotating kilns annual shutdowns as Project leader for major equipment overhauls.
-
Plant lubrication supervisor as well as rotating equipment repair, maintenance and installation team supervisor
-
Developed numerous written job scopes and Standard Work Instruction for equipment repair.
-
Developed maintenance strategies for various rotating and static equipment as the plant transitioned from their 20-year-old in-house built CMMS to the newly acquired EXP Ivara software.